A NEW PRODUCTION WELL AT RIS ORANGIS (Paris area) – 2015 –

A NEW PRODUCTION WELL AT RIS ORANGIS (Paris area) – 2015 –

Exploited since 1983, the geothermal RIS ORANGIS needed a second wind. Drilling operations for the new GRO-3 producing well were completed from November 4 to December 15, 2015. The GRO-3 structure captures the reservoir at a depth of 2104 meters. The device will now work in triplet.

See the technical sheet PDF