Audit of the facilities at a geothermal plant for the production of electricity and feasibility study for putting buried and immersed facilities under cathodic protection (2005)

Audit of the facilities at a geothermal plant for the production of electricity and feasibility study for putting buried and immersed facilities under cathodic protection (2005)

Goal : to put implement an action plan for combating corrosion problems and assist the geothermal plant’s contracting authority to search for and select a technical solution for putting equipment under cathodic protection.

Corrosion audit:
  • Inventory and analysis of the problems linked to corrosion for all the geothermal plant’s equipment
  • Drawing up an action plan to combat corrosion and ensure the long life of the equipment
Cathodic protection:
  • Drawing up the specifications for putting the facility under cathodic protection
  • Search for service providers
  • Analysing bids
  • Recommendations to the contracting authority