Resizing the geothermal production at Sucy-en-Brie (2008)

Resizing the geothermal production at Sucy-en-Brie (2008)

In order to sustain and increase exploitation of the geothermal resource (Dogger) in the town of Sucy-en-Brie (94), CFG Services carried out an engineering and project management mission on behalf of SOGESUB. This involved drilling a new production well and renovating the two existing wells for reinjecting the geothermal fluid. This is the first geothermal triplet realised and brought into operation in the Ile-de-France region.