Project management of the doublet of BAGNEUX (92)

Project management of the doublet of BAGNEUX (92)

The new doublet BAGNEUX (13 MW) located in the department of HAUTS DE SEINE takes water at about 65 ° C at the reservoir of the Dogger. It supplies 9,500 housing equivalents, or about 25,000 inhabitants. REDUCES EMISSIONS OF 15,000 TONS OF CO2 PER YEAR AGAINST A GAS...
A NEW PRODUCTION WELL AT RIS ORANGIS (Paris area) – 2015 –

A NEW PRODUCTION WELL AT RIS ORANGIS (Paris area) – 2015 –

Exploited since 1983, the geothermal RIS ORANGIS needed a second wind. Drilling operations for the new GRO-3 producing well were completed from November 4 to December 15, 2015. The GRO-3 structure captures the reservoir at a depth of 2104 meters. The device will now...